Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13706652

- Product Categories
- Friendly Links
Information Name: | Jiaxing plastic runway for doing |
Published: | 2015-05-16 |
Validity: | 360 |
Specifications: | SJ-13mm |
Quantity: | 100.00 |
Price Description: | |
Detailed Product Description: | Sporting Equipment Co., Ltd. Shanghai Tang Xuan plastic track description Product Features: 1, up to the national standards. Paving machinery, mechanical spraying, good flatness, no threshing phenomenon. 2, there is porosity, water permeable, breathable, excellent flexibility, no blistering. 3, all-weather use, wear resistance, weather resistance, compression resistance, resistance to impact resistance, durable. 4, the price of the economy. 1. Mixed runway pavement Process Description: Pavement Technology plastic runway project is the use of a three-step construction method Deck. First, adding an appropriate amount of the rubber particles in the glue, paving primer thickness of 8 mm, wait until the cure, again above the pavement thickness of 2 mm glue, sprinkle with artificial red particles are uniformly recovered excess glue tablets, and finally spray a layer of glue on top. Process diagram: cleaning → primer site mixing ingredients → → → curing → spreading → anti-foaming surface plastic mixing ingredients → → → spreading → defoaming recycling particles scatter particles → → → roller plastic measuring objects → Detection dotted line → completed 2. Breathable runway: Features: 1, up to the national standards. Paving machinery, mechanical spraying, excellent flatness, no threshing phenomenon. 2, there is porosity, water permeable, breathable, excellent flexibility, no blistering. 3, all-weather use, wear resistance, weather resistance, compression resistance, resistance to impact resistance, durable. 4, the price of the economy. Construction steps: 1, site cleaning, concrete coated base oil, asphalt surface Scraping 2, the mechanical laying of the underlying 8mm thick, one-component adhesive + rubber particles 3, mechanical spraying the surface layer 5mm thick, one-component adhesive + EPDM granules, again Spray again in the opposite direction. 4, track measurement, stakeout and identification line. 5, site cleaning and exit. 3. Composite runway; breathable with mixed underlying surface combine production methods, either shorten the construction period, and can not degranulation, reduce costs. |
Admin>>>
You are the 25005 visitor
Copyright © GuangDong ICP No. 10089450, Sports Equipment Co., Ltd. Shanghai Tang Hin All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 25005 visitor
Copyright © GuangDong ICP No. 10089450, Sports Equipment Co., Ltd. Shanghai Tang Hin All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility